About this analysis. Washington requires every on-site septic system to be inspected on a recurring cycle: at least every three years for a septic tank with a gravity drain field, and every year for anything more complex. Each county adds to that. King County sets its own minimum monitoring frequencies by system type, and Pierce County assigns each system a risk classification that sets how often the result must be reported to the health department. The inspection must be filed with the health department, and those filings are public records.
This analysis covers more than 245,000 inspections across upwards of 144,000 septic properties in Pierce and King counties, as recorded by the Tacoma-Pierce County Health Department and King County Public Health. Because inspection is mandatory rather than voluntary, this is a near-complete record of professional septic service in both counties rather than a survey sample: there is no response bias and nothing is self-reported by homeowners.
Definitions. A deficiency is an inspection filed with a status of Deficient; severity is not recorded, so a deficiency may be anything from a missing riser lid to a failed drain field. A failure rate is deficiencies as a share of inspections filed, not of properties, which avoids bias from properties observed over different lengths of time. Past due means no inspection on file within the interval that property's system type calls for.
The limits on the past-due figures. A due date depends on the system type, so these cover only the 59,325 properties where the type is recorded — 41% of the total. The other 84,773 are excluded rather than assumed compliant, and the recorded share is far higher in King County than in Pierce, so comparisons between towns in different counties carry that difference with them. Separately, Pierce County's reduced-frequency programme moves eligible owner-occupied gravity systems from a three-year cycle to a five-year one and approvals are not visible in the filings, so a share of those counted as past due are legitimately on the longer cadence. An earlier cut of this analysis also placed pressure-distribution systems on the three-year cycle; the state rule puts them on an annual one, and correcting it moved 4,036 households into the past-due count.
Scope and limits. Inspection figures cover 2015 to 2025; deficiency resolution covers 2015 to 2024; the record was queried on 28 August 2026 and the underlying pipeline is live, so counts drift. Individual property owners are not identified, and no figure here describes any single company's results.