Gig Harbor Septic Pumping and Stress Test
A Gig Harbor couple planning a shop with a bathroom needed to show their system could take the extra flow. Pumped, inspected, drawdown at 2.25 inches a minute, and a 180-gallon stress test with nothing surfacing.









